Road Maintenance Department
Road Supervisor
Cell : (218) 380-1575
Relevant Documents
- Road Maintenance
- Road Reports
- Monthly Road Reports
- 2023 Road Reports
- Annual Road Reports
- Monthly Road Reports
- Maps & Mileage
- Road Projects
- Sturgeon Island Bridge ( S.A.P # 009-599-045)
- Birchview Road Box Culvert Project (S.A.P. # 058-599-046)
- Island Lake Road Box Culvert Project (S.A.P. # 058-599-048)
- MN State Disaster # 2023-SD-070
- RFQ - Request for Quotes
- QUOTE SHEET EQUIPMENT RENTAL - 2023 Windemere Township
- WINDEMERE TOWNSHIP - Responsible Contractor Statement
- WINDEMERE TOWNSHIP ROADS with Mileage & Location (Excel Document)
- WINDEMERE TOWNSHIP ROADS with Mileage (Word Document)
- Map - All Windemere Township Roads (Asphalt & Gravel - 79 Total Roads 49.479 Miles)
- POSTING NOTICE March 2023 - Windemere Township 2023 Equipment Rental RFQ
- MN State Statute 16C.28 Contracts; Award
- MN State Statute 16C.285 Responsible Contractor Requirements Defined
- 2020 MNDOT Standard Specifications For Construction (Volume 1)
- 2020 MNDOT Standard Specifications For Construction (Volume 2)
- 2022 Supplemental Specifications To the 2020 MNDOT Standard Specifications For Construction (September 2022)
- ContractsFHWA - Gravel Roads Construction & Maintenance Guide (August 2015) Publication # FHWA-OTS-15-0002
- Contracts
- Road Grading
- Snow & Ice Removal
- Road Ditch R.O.W. (Mowing)
- Road R.O.W. Clearing (Tree Debris)
- Class-5 Gravel Crushing
- Historical Analysis & Reports
- Road Reports